Construction Contracts – Week of 5.18.12 (access required)

POSTED: Thursday, May 17, 2012 at 08:29 AM PT
BY: IBR Staff

POE Asphalt Paving was the apparent low bidder among five on the 2012 Old Highway 1 overlay in the Grangeville area. Bid: $1,250,603.80 Nampa Paving was the apparent low bidder among five on the 2012 Plant Mix Paving in the Caldwell area. Bid: $491,985.14 A Williams & Sons LLC was the only bidder on the [...]

Contracts – Week of 5.11.12 (access required)

POSTED: Wednesday, May 9, 2012 at 10:19 AM PT
BY: IBR Staff

Buddys Backhoe was the apparent low bidder among three on the 2012 open trench project in the Coeur D’Alene area. Bid: $248,512.25 Ken’s Construction Inc. was the apparent low bidder among two on the westbound Cotterel POE scale deck in the Shoshone area. Bid: $15,500.00. Seubert Excavators was the only bidder on the District 3 [...]

Contracts – Week of 5.11.12 (access required)

POSTED: Monday, May 7, 2012 at 10:58 AM PT
BY: IBR Staff

Buddys Backhoe was the apparent low bidder among three on the 2012 open trench project in the Coeur D’Alene area. Bid: $248,512.25 Ken’s Construction Inc. was the apparent low bidder among two on the westbound Cotterel POE scale deck in the Shoshone area. Bid: $15,500.00. Seubert Excavators was the only bidder on the District 3 [...]

Construction Contracts Awarded – Week of 5.4.12 (access required)

POSTED: Monday, May 7, 2012 at 10:52 AM PT
BY: IBR Staff

Landon Excavating Inc., was the apparent low bidder among six on sewer line replacement. 15th St. Curtis to Yellowstone in the Idaho Falls area. Bid: $67.867.98 Graybar Electric Company was the apparent low bidder among three on Landfill gas valve vaults in the Boise area. Bid: $104,120.00 Quick Now was the apparent low bidder among [...]

Contracts – Week of 4.13.12 (access required)

POSTED: Wednesday, May 2, 2012 at 05:20 PM PT
BY: IBR Staff

Macnak Construction was the only bidder on East Fork Weiser River Replacement, in the Weiser area. Bid: $274,625. Alloway Electric Co., Inc. was the apparent low bidder among three on Historical Street Lights 2012, in the Boise are. Bid: $102,000. POE Asphalt Paving was the apparent low bidder among two on District 2 materials LABL [...]

Contracts Awarded – Week of 4.27.12 (access required)

POSTED: Wednesday, May 2, 2012 at 03:44 PM PT
BY: IBR Staff

Washburn Contract Services was the only bidder on District 3 herbicide application. Knife River was the only bidder on Woodside Blvd reconstruction. SCS Field Services was the only bidder on Landfill gas blower and flare system procurement project. Interstate Conc. & Asphalt Co. was the apparent low bidder on 2012 Education corridor infrastructure project. Bid: [...]

Contracts Awarded – Week of 4.20.12 (access required)

POSTED: Wednesday, May 2, 2012 at 03:02 PM PT
BY: IBR Staff

Knife River was the only bidder on Woodside Boulevard Reconstruction in the Hailey area. SCS Field Services was the only bidder on Landfill Gas Blower & Flare System Procurment Project, in Bannock County. Interstate Conc. & Asphalt Co was the apparent low bidder among three on the 2012 Education Corridor Infrastructure Project in the Coeur [...]

Contracts-Week 3/2/12 (access required)

POSTED: Thursday, March 1, 2012 at 09:04 AM PT
BY: IBR Staff
Tags:

Cannon Builders is the apparent low bidder on a Texas Slough bridge in Madison County. Bid: $150,755 Snake River Valley Irrigation is the apparent low bidder on Bohannon Creek irrigation delivery in Lemhi County. Bid: $88,492 Skaar Construction is the apparent low bidder on an American Falls water storage reservoir. Bid: $1,198,000 Central Paving is [...]

Contracts-Week of 2/24/12 (access required)

POSTED: Thursday, February 23, 2012 at 09:37 AM PT
BY: IBR Staff
Tags:

H-K Contractors Inc. is the apparent low bidder on Tautphaus Park street rehabilitation 2012 in Idaho Falls. Bid: $46,108 Utility Trailer Sales of Boise is the apparent low bidder on a new/unused 2012 construction field service crane for Boise. Bid: $27,461 Knife River is the apparent low bidder on 2012 maintenance crack seal projects in [...]

Contracts-Week of 2/17/12 (access required)

POSTED: Friday, February 17, 2012 at 08:51 AM PT
BY: IBR Staff
Tags:

Imperial Asphalt was awarded a contract for crack sealing of county roads in Bingham County. Bid amount not listed. Engineers Estimate is the apparent low bidder for citywide well rehabilitation projects in Idaho Falls. Bid: $125,000 D.L Beck Inc. is the apparent low bidder on Ashton Water System Improvement Phase 1 Nitrate Treatment. Bid: $1,398,100 [...]

  • RSS Facebook Twitter LinkedIn

  •