Quantcast
Home / News / Construction / United Water to add southeast Boise plant (access required)

United Water to add southeast Boise plant (access required)

Work is expected to begin in September on a $12 million water-treatment plant incorporating "state of the art membrane filtration" – and possibly ultra-violet disinfection – in southeast Boise.With an initial capacity of 6 million gallons per day, the plant would increase United Water's treatment capacity by about 7 percent when it comes on line, ...

About IBR Contributor