Quantcast
Home / News / Construction / Fred Meyer store construction proceeds toward summer opening (access required)

Fred Meyer store construction proceeds toward summer opening (access required)

  A 171,000-square-foot Fred Meyer store and a separate FM Fuel station are slated to open June 22 at the northeast corner of U.S. 20-26 and Linder Road, Eagle, spokeswoman Amanda Ip said.  General contractor Engineered Structures Inc. reported the building is now at maximum height, and work on front entrances and the interior has started. Most ...

About Brad Carlson