Quantcast
Home / News / Construction / I-84 will have new pavement for last 12.5 miles to Oregon (access required)

I-84 will have new pavement for last 12.5 miles to Oregon (access required)

Interstate 84 will be about 3 inches higher for the last 12.5 miles before reach the Snake River once a three-month repaving project wraps up in mid-October. Traffic has been reduced to one lane in each direction since mid-July to enable Boise-based Western Construction to repave I-84 between the Oregon state line and the Black Canyon ...

About Teya Vitu

Teya Vitu is an Idaho Business Review reporter, covering commercial real estate, construction, transportation and whatever else may intrigue him in the moment. Join me on Twitter at @IBR_TeyaVitu.