Quantcast
Home / News / Construction / Broadway merge lane closes between Myrtle and the bridge (access required)

Broadway merge lane closes between Myrtle and the bridge (access required)

Most of the merge lane from Myrtle to southbound Broadway closed to vehicle traffic on Aug. 31 for utility relocation work in advance of the Broadway Bridge replacement project, the Idaho Transportation Department reported. The adjacent sidewalk from Myrtle to the bridge closed Sept. 1 and will remain closed for the next 10 weeks, though that ...

About Teya Vitu

Teya Vitu is an Idaho Business Review reporter, covering commercial real estate, construction, transportation and whatever else may intrigue him in the moment. Join me on Twitter at @IBR_TeyaVitu.