Quantcast
Home / News / Construction / Pioneer Corridor should reach Greenbelt by year’s end (access required)

Pioneer Corridor should reach Greenbelt by year’s end (access required)

The final 700 feet to take the brick-paved Pioneer Corridor from River Street to the Boise River Greenbelt could be completed by the end of the year, according to the Capital City Development Corp. CCDC built the current Pioneer Corridor bike/pedestrian route from 11th and Myrtle streets to River Road in segments in 2011, 2012 and ...

About Teya Vitu

Teya Vitu is an Idaho Business Review reporter, covering commercial real estate, construction, transportation and whatever else may intrigue him in the moment. Join me on Twitter at @IBR_TeyaVitu.