Quantcast
Home / News / Construction / Design starts on the second building for The Afton condos (access required)

Design starts on the second building for The Afton condos (access required)

Design work has started on the second phase of The Afton condominium project as construction of the first phase of the downtown Boise project has passed the halfway point. There have been enough reservations for condos in the six-story, 28-unit first structure at River and Eighth streets for developer Michael Hormaechea to start work on the ...

About Teya Vitu

Teya Vitu is an Idaho Business Review reporter, covering commercial real estate, construction, transportation and whatever else may intrigue him in the moment. Join me on Twitter at @IBR_TeyaVitu.